Underground Fiber Construction From Route Preparation Through Restoration

Dunamai crews build underground fiber pathways, pull cable, and complete the physical fiber placement required to move infrastructure projects forward.

Send Project Details for Review Call (915) 401-9272

One Coordinated Field Scope Around the Fiber Route

Fiber construction rarely affects only the ground below the route.

Dunamai crews complete the fiber scope through one project-management and field-leadership structure, considering the route, construction method, access conditions, installation sequence, affected surfaces, adjacent trades, and requirements for related surface work as connected parts of the same field operation.

Services Not Provided by Dunamai

Dunamai does not provide:

  • Fiber splicing.
  • Fiber testing.
  • Terminations.
  • As-built documentation.
  • Network activation.

Those responsibilities must be assigned to other members of the project team.

A Strong Fit for Coordination-Sensitive Fiber Projects

  • Planned underground fiber routes requiring trenching or directional boring.
  • Conduit, pull rope, handholes, or vaults.
  • Cable pulling and physical fiber placement.
  • Routes crossing asphalt, concrete, sidewalks, curbs, roadways, or landscaped areas.
  • Active commercial, industrial, or infrastructure sites.
  • Work areas shared with other contractors or construction phases.
  • Projects where restoration timing affects access, subsequent work, or final turnover.
  • Owners and general contractors seeking one coordinated Dunamai field scope from pathway construction through surface restoration.

How the Fiber Scope Moves

  1. Review the Project Scope

    Review the available drawings, route information, project location, access conditions, construction requirements, affected surfaces, schedule, and interfaces with other contractors.

  2. Plan the Field Sequence

    Coordinate trenching or boring, conduit and access-point installation, cable or fiber placement, backfill, followed by restoration within the larger project schedule.

  3. Construct the Underground Pathway

    Complete the agreed trenching, directional boring, conduit, pull-rope, handhole, vault, and related underground construction work.

  4. Pull and Place the Fiber

    Perform the cable pulling and physical fiber placement included in Dunamai’s contracted scope.

  5. Restore the Site

    Restore the affected asphalt, concrete, roadway, sidewalk, curb, landscaping, or other surfaces so the work area is ready for continued construction or final use.

Project example

Underground conduit route

Conduit installed in a prepared utility trench.

Since 2015, Dunamai crews have completed underground utility, fiber, and concrete construction across New Mexico and Texas, while the company coordinates asphalt scopes when included.

Fiber Construction Across El Paso, West Texas, and Southern New Mexico

Dunamai serves owners, general contractors, and project teams across New Mexico and Texas, including El Paso, West Texas, and Southern New Mexico. Share the project location, route information, available drawings, schedule, access conditions, placement requirements, and the requirements for restoring affected surfaces to begin a focused project discussion.

Request a Project or Bid Review

Include the project location, available plans or scope details, requested service, schedule, and bid timing so Dunamai can review project fit.

Start a Project Inquiry